{dede:field.typename/}
Techase Events

Applications of Black and Odorous Water Body Management

2019-03-28     Source:未知

Black and Odorous Water Treatment Project of Long xi Lake and Ma Ji Sha River in Jiang Men City

The total dredging volume of Long xi Lake and Ma Ji Sha River is below 156,000 waters, among them, Long xi Lake has a dredging volume of 56,000 cubic meters, and Ma Ji Sha River has a dredging volume of about 100,000 cubic meters. There are 4 sets of special quick presses for river and river dredging on site, and the construction period is 4 months.

       


Water Clean Project in Downtown Suzhou

The project is a main dredging project in Suzhou, including 10 dredging rivers (sections)in total, like Shan tang River, Hu qiu mountain around River (including tributary), duck's foot beach, Yuan gen beach, and Shuo fang zhuang River, with a total length of 18 kilometers. This Dredging earthwork has 240,000 cubic meters in total. 8 sets special dredging quick press for river and lake were used, and dredging work was completed in 2 months.

       


Nannei River Project in Leping City of Jiangxi Province

The total sludge treatment capacity is close to 110,000 water, and the moisture content of the treated mud cake is 50%. There are 2 sets of special quick presses for river and river dredging on site, and the construction period is 6 months.

         http://www.techase.com/uploads/allimg/190409/2_1131423955.jpg


Jia Tang Port Project In Nan Xun District of Hu Zhou City

http://www.techase.com/uploads/allimg/190409/2_1138125831.jpg


Ecological Restoration Project of West Tai Hu Lakeside Dike

         

上一篇:3.15 Topic | Quality, Make Consumption More Secure